Case Studies

Piling for single story extension in Burnley

The client came to us knowing the site had poor ground conditions. After a site inspection we confirmed the ground required a piled foundation solution. We quoted based on our engineers design and our client accepted. The full process took us 1.5 day start to finish.

Piling for double story extension in Radcliffe.

A client we have previously worked with came to us knowing the ground he was currently working on would need piling work; this was confirmed after a site visit. Our quote was accepted and we started work on site. All the piling work was finished on the Friday and concrete was poured the following Monday.